General Features:

  • Choice of Automatic Schedule Generation Methods: Schedule forward from Project Start Date or Schedule backward from Project End Date. .:Click Here for More Information About Automatic Scheduling Features
  • Ten kinds of task constraints to choose from.
    • Default
    • As Soon As Possible
    • As Late As Possible
    • Must Finish On
    • Must Start On
    • Start On or After
    • Start On or Before
    • Finish On or After
    • Finish On or Before
    • Lock Plan Dates
  • Four kinds of predecessor-task relationships to choose from. Each task-predecessor link can have lead or lag time assigned.
    • Finish to Start
    • Start to Start
    • Finish to Finish
    • Start to Finish
  • Tasks can have any number of predecessors.
  • System automatically detects and prevents circular relationships when you add predecessors to tasks.
  • No limit to the number of Calendars that can be created for each schedule.
    • Each Calendar defines the days of the week that are worked, the hours worked per day, the start time of the work day, and the holidays in the year not worked.
    • Each task can use the same or a different Calendar.
  • Tasks can have any number of resources assigned to them.
  • Task-resource assignments can be less than 1 for fractional assignments (e.g. 50% utilization) or greater than one for crew assignments.
  • You can have unlimited levels (parent-child relationships) in your Work Breakdown Structure (WBS).
  • Your WBS structure can use multiple depths. For example tasks can start at Depth 2 in part of your structure, and Depth 3 at another part.
  • You can have unlimited levels (parent-child relationships) in your Organizational Breakdown Structure (OBS).
  • Your OBS structure can use multiple depths.
  • You can set the baseline dates for the entire schedule with one click.
  • Set up different charge rates for each project, by resource-title. When you assign these titles to resources, they assume the project charge rate. Change the charge rate for all resources in the project just by changing the charge rate schedule for the project.
  • Your Administrators can
    • lock the schedule from changes
    • lock the baseline from changes
    • can assign roles to users that will determine their ability to review or change schedules.